-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document
-
Bute. Annual reports and final report to licence full surrender, for the period 23/3/1993 to 11/12/1998.
Gold and base metal exploration conducted near the SA Lower North township of Bute, 140 km north-west of Adelaide, comprised the conduct of IP and ground magnetic surveys and RC drilling (4 holes, total 350 m). Two holes drilled on magnetic anomaly...-
Document
Published: 23 Mar 1999