-
Maitland [second JV programme]. Progress reports for the period 17/8/81 to 14/5/84.
Continuing mineral exploration work over central Yorke Peninsula under a new joint venture arrangement with a different company, now targetting possible Phanerozoic sedimentary uranium in Cambrian and Tertiary strata, has consisted of investigations...-
Document
-
Minlaton. Progress reports plus final report to licence full surrender, for the period 27/4/1977 to 6/12/1978.
One diamond and seven rotary/percussion drillholes tested Cambrian rocks for base metals. Six water bores were logged geophysically. IP/resistivity and gravity surveys were undertaken.-
Document
-
RB 2000/00013 Australian Clay Minerals Society Inc. 17th Biennial Conference, Adelaide, 10-12 April 2000: Field Guide for post-conference tour, 13-14 April 2000 - Yorke Peninsula clays and carbonates, copper mines, desert loam soils and mangroves.
This tour is concerned with aspects of the soils, geology, landforms, clays and mining on Yorke Peninsula, and likewise for the northern Adelaide Plains which are separated from the Peninsula by Gulf St Vincent. Both of these regions are among the...-
Document
Published: 01 Apr 2000
-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979