-
Melton. Progress reports to licence surrender, for the period 21/7/1980 to 24/5/1989.
A small area located about 20 km north-west of Port Wakefield was taken under licence by ETSA to try to secure limestone/dolomite material of suitable quality and in sufficient quantity to provide chemical additives for aiding the process of...-
Document
Published: 20 Apr 1989
-
Bute. Annual reports and final report to licence full surrender, for the period 23/3/1993 to 11/12/1998.
Gold and base metal exploration conducted near the SA Lower North township of Bute, 140 km north-west of Adelaide, comprised the conduct of IP and ground magnetic surveys and RC drilling (4 holes, total 350 m). Two holes drilled on magnetic anomaly...-
Document
Published: 23 Mar 1999