-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-10, Harris Greenstone Belt mineral prospects. Project interim and final reports.
In September and December 2004 Mithril Resources completed 53 vertical aircore and reverse circulation drillholes on Exploration Licence 2842 as part of the SA Government's PACE Initiative 'Theme 2' collaborative drilling programme involving PIRSA...-
Document
-
RB 2020/00018 Gawler Craton Airborne Geophysical Survey Region 9B, Kingoonya – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2020
- ZIP,
-
Bull 055 A geochronological framework for the Gawler Craton, South Australia
This bulletin contains geochronological data and interpretations from the Gawler Craton of South Australia that have been completed by Mark Fanning of The Australian National University, by Geological Survey of South Australia personnel, and by...-
Document