RB 36/00082 Wagon drilling programme, Katunga Hills, Middleback Range. Progress report.
Report presents results of reconnaissance wagon [rotary percussion] drilling of 24 vertical iron ore exploration boreholes carried out along four drill traverses laid out on the upland portions of the Katunga Hills, during a campaign progressed during...-
Document
Published: 04 Nov 1953
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document