RB 37/00077 Petrology of the cores of bores no. 1 and 2, Middleback Ranges.
A representative selection of rock types obtained in the cores of the DDH1 and DDH2 iron ore exploration holes was made with a view to studying the mineralogy, the lithology and any microstructures of interest present in the formations intersected. A...-
Document
Published: 05 Apr 1954
-
Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.
A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 2019
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
Data release - as updated [made at SA Director of Mines' discretion] : Lipson Cove. Annual reports for the period 29/9/2009 to 28/9/2014.
An area in the Cowell Hills centred ~20 km north of Tumby Bay on eastern Eyre Peninsula was taken up primarily to explore and evaluate known talc and graphite occurrences, but the grant licensee's initial review of previous exploration data revealed...-
Document
Published: 12 Dec 2014