-
Data release [made at SA Director of Mines’ discretion] : Stony Hill (part of the Northern Eyre Peninsula Project). First annual report (submitted prior to start of the project's joint reporting status), for the period 2/12/2004 to 1/12/2005.
A licence area covering the subdued hilly terrain lying a short distance to the west of the northern Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore which...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Waddikee. Annual reports to licence expiry/renewal, for the period 24/5/2005 to 23/5/2010.
An area centred ~20 km south-southwest of Kimba is being explored for possible buried Tanami style orogenic lode gold and also for Mount Isa / Broken Hill style base metals mineralisation, which could occur within reactive chemical and pelitic...-
Document
Published: 10 Aug 1910
-
Data release [made at SA Director of Mines' discretion] : Middleback Range. Progress reports and annual reports to licence expiry/renewal, for the period 6/6/1990 to 5/6/1995.
A licence area consisting of two separate sub-blocks that cover ~460 square km of Palaeoproterozoic BIF ironstone outcrops in the northern and southern parts of the Middleback Range on north-eastern Eyre Peninsula was taken up by The Broken Hill Pty...-
Document
-
Verran (part of the Kimba-Verran Joint Venture Project, and also part of the Eyre Peninsula Joint Venture Project). Annual and combined annual reports for the period 28/6/2002 to 11/7/2009.
No field work was conducted on the subject licence area, which comprises three sub-blocks, for all of Years 6-11 (period 2002-2008) on EL 2981. During Year 8 of the project (8th March to 28th December 2004), exploration activities were reported...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-27 - Cleve area Proterozoic unconformity-style uranium mineral prospects. Project final report.
In May 2009 a total of 45 aircore blade or hammer holes (total penetration 1332 m) were drilled by Adelaide Resources along six northeast-southwest trending traverses laid out immediately south-west of Cleve, to test a conceptual unconformity - style...-
Document