Lake Gilles area. Data release made in lieu of submitting a partial surrender report upon licence renewal : progress reports for the period 26/10/1989 to 10/2/2001.
Menninnie Dam - style Pb-Zn mineralisation in areas north and east of Lake Gilles was the initial target of exploration. A ground magnetic survey conducted along five lines was followed by shallow auger drilling (302 holes, total 1099 m) plus lag,...-
Document
-
Nilginee Dam. Annual reports to licence expiry/renewal for the period 15/3/1993 to 14/3/1998.
A low-lying small area situated 40 km west of Whyalla has been explored primarily for economic gypsum occurrences within Recent surficial sediments, while latterly, a search for metallic minerals has also commenced, via a geological survey of basement...-
Document
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Tooligie Hill. Annual reports submitted until the commencement of joint reporting on Southern Eyre Peninsula JV Project, for the period 3/12/1999 to 10/3/2006.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines’ discretion] : Verran. Annual reports to licence expiry/renewal, for the period 4/4/1997 to 3/4/2002.
Part of the Cleve Uplands centred 15 km west of Cleve has been taken under licence to explore its potential for buried economic copper-gold mineralisation to occur within Archaean or Proterozoic basement rocks. Other possible commodities of interest...-
Document
Published: 05 Sep 2002
-
The Northern Eyre Peninsula JV Project. Data release made in lieu of submitting a licence final report at the full surrender of EL 5170 Kimba Gap: Joint annual reports for the period 1/2/2013 to 9/2/2017.
During the Northern Eyre Peninsula Project (NEPP) 2013-2014 reporting year, exploration field work took place on two of the six project tenements. On EL 4884 Minbrie, a single 151 m deep vertical RC drillhole, BURC092, was completed in August 2013,...-
Document
Published: 25 Sep 2018
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008