RB 80/00141 Angas-Bremer irrigation area groundwater recharge.
Within the Angas - Bremer Irrigation Area, the source of the groundwater being taken currently primarily for the large-scale irrigation of lucerne fodder crops is the confined low salinity Tertiary limestone aquifer. The extent of pumping from bores...-
Document
Published: 01 Dec 1980
-
RB 96/00015 Regional groundwater impacts of irrigation development in the eastern Riverland.
A regional groundwater model has been constructed of the Loxton Sands watertable aquifer in the eastern Riverland, over an area extending eastwards from Overland Corner to the State border. It is being used to quantify the salt load impacts on the...-
Document
Published: 01 Dec 1995
-
RB 96/00017 River Murray water resource management. Assessment of salt load impacts and drainage hazard for new irrigation development along the River Murray in South Australia.
The Murray-Darling Basin Commission (MDBC) has a commitment in the national interest to managing the health of the River Murray and floodplain environment by mitigating both decreases in river water quality and associated environmental degradation...-
Document
Published: 01 May 1996
-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document
-
1981 and 1983 seismic surveys, Overland Corner OC81 and OC83, final reoprt.
AIM: The principal objective of the OC81 Seismic Survey and a calculated, normal moveout velocity-based seismic reflection time stratigraphic well tie to North Renmark 1 was to determine the areal extent of the prospective Permian (and Devonian?)...-
Document
-
RB 61/00079 River Murray drainage investigation. Progress report no. 4. Stratigraphy and micropalaeontology of Waikerie bore no. 2.
Waikerie Bore No. 2, drilled 2½ miles south-west of Waikerie township, bottomed at 775 feet in sands of the Knight Group, after passing through a sequence of Quaternary beds, Norwest Bend Formation, Morgan Limestone, Finniss Clay equivalent (?),...-
Document
Published: 22 Sep 1965
-
Waikerie. Annual reports and final report to licence expiry/full surrender, for the period 18/1/2005 to 17/1/2010.
Landmark Stone Pty Ltd was approached by David West (Executive Director, Architectural Conservation, International Conservation Services of Sydney) to investigate re-opening one of the three Waikerie Limestone quarries in the Riverland of South...-
Document
Published: 28 Oct 1909
-
Sedan lignite deposit. Geological investigations and review of resources.
In October 2000 GTL Energy Pty Ltd began commercial investigations into the feasibility of establishing within Australia newly proven [coal] gas-to-liquids technology for combining power generation and synfuel production, by identifying potentially...-
Document
-
RB 2000/00037 Qualco Sunlands groundwater control scheme - Stage 2: QS9 drilling and well testing completion report.
The contract drilling of three production wells, three combined interflow/production wells, three interflow wells, one observation well and seven drainage wells was carried out by Thompson Drilling Company as part of Stage 2 of the Qualco Sunlands...-
Document
Published: 01 Sep 2000