Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 1919
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 1920
-
Woollinie. Progress reports and annual reports plus final report to licence full surrender, for the period 20/12/1991 to 20/11/1995.
Exploration for Broken Hill / Menninnie Dam type Pb-Zn, and later for iron oxide - associated Cu-Au, that was undertaken over an area located north of Kimba within and adjacent to the Pinkawillinie Conservation Park, comprised the acquisition during...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-17, Menninnie Dam area base metal and gold mineral prospects. Project final report.
During February-July 2005, a PACE Initiative collaborative drilling programme with PIRSA was prepared and undertaken by Terramin Australia at the Menninnie Dam prospect to investigate two objectives: · The B1 cerussite target identified by drilling...-
Document