-
RB 81/00037 South Eastern Freeway - Glen Osmond to Crafers re-alignment. Proposed Wylie Ridge tunnel, geological summary report.
A double tunnel is proposed through Wylie Ridge to carry the southeastern freeway into Adelaide thus by-passing the Devil's Elbow. The tunnel would pass through a fault block containing the Mitcham Quartzite and the underlying siltstones (Glen Osmond...-
Document
Published: 01 Jan 1981
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 98/00014 Clare Drilling. Phase 2 - June 1997.
Phase Two of a drilling program at Clare, South Australia was undertaken in June, 1997. A total of 6 bores were drilled, 4 of these at existing locations established during Phase One drilling in January, 1996, and a further 2 at Watervale Oval as...-
Document
Published: 01 Mar 1998
-
RB 62/00028 Report on geochemical investigation, Burra project.
The pedological environment of the Burra area is described, the methods of soil sampling and sample penetration are given in detail and an outline of the spectrographic analytical procedure is given. Attempts at applying statistical methods to the...-
Document
Published: 02 Feb 1966