-
RB 92/00045 Upper South-East dryland salinity and flood management plan. Excavation characteristics and slope design for the drainage channels.
The Upper South-East Dryland Salinity and Flood Management Plan proposals aim to address the worsening salinisation problems now clearly visible in the area. This report provides feasibility and preliminary project design data to the EWS engineers who...-
Document
Published: 01 Sep 1992