-
RB 2007/00012 Mount Monster rhyolite deposit near Keith - potential resumption of quarrying.
Over the period from 1955 until 1976 an outcrop of Ordovician porphyritic rhyolite was quarried for road-sealing aggregate and rail ballast from two quarries at Mount Monster, 12 km south of Keith. The total recorded production was 548,000 tonnes....-
Document
Published: 01 May 2007
-
Interpreted basement geology to the Murray Basin and surrounds.
The purpose of this interpretation is to provide an initial framework for the basement to the Murray Basin upon which to plan the Geological Survey of South Australia’s MinEx CRC National Drilling Initiative drilling project targeting the Delamerian...-
Map
Published: 07 Jul 2020
- PDF,
- ZIP