-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Mount Pitt. Progress and final reports for the period 6/4/81 to 5/10/81.
As part of a regional search for economic small-scale deposits of rare earth metals in the Mount Painter district, geochemical prospecting revealed several atypically high background niobium values, in stream sediments derived from watercourses known...-
Document
-
RB 89/00048 Review of SADME diamond drilling and company exploration at Parabarana copper prospect, northern Mount Painter Block.
During intensive exploration for an economic copper resource in the Parabarana Hill area from 1968-1975, North Flinders Mines Ltd approached SADM for direct assistance in proving the indicated deposit. SADM drilled 2 diamond drill holes, from...-
Document
Published: 01 May 1989
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document