-
Gawler Project Central Tenement Block [Part]. Data release at licences' joint partial surrender: Southern Gold gold exploration JV - specific annual reports 6/2/2006 to 30/6/2009. [Index Part 2 of 2].
After the Southern Gold joint venture agreement was signed in February 2006, that company as JV operator performed a due diligence review of Dominion Mining's exploration data, did some orientation soil calcrete and biogeochemical sampling at Typhoon...-
Document
Published: 02 Feb 1910
-
Trial Well. Progress and final reports to licence surrender for the period 15/6/79 to 4/1/82.
TARGET: An assessment of the potential for uranium and lignite deposits within the Eocene Pidinga Formation, and separate investigations of coincident, possible Olympic Dam target type magnetic and gravity anomalies in the crystalline Precambrian...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Commonwealth Hill area (the Eaglehawk Joint Venture Project). Annual reports for the period 22/6/2012 to 21/6/2017.
An area centred ~115 km south-west of Coober Pedy is being explored for possible economic buried precious and/or base metal mineralisation (including iron ore) that may exist in predominantly buried Archaean or younger Proterozoic basement rocks, as...-
Document
Published: 29 Aug 2017
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 2009