-
Lake Gregory. Final report at licence full surrender, for the period 13/5/2016 to 9/3/2017.
A licence area covering a large salt lake (Lake Gregory) of the Cenozoic Lake Eyre Basin, and the underlying Mesozoic Eromanga Basin sediments situated to the north of the uranium-rich Mount Babbage and Mount Painter inliers, ~120 km north-east of...-
Document
-
Benagerie. Progress reports and annual reports, plus final report to licence full surrender, for the period 13/11/1979 to 9/3/1989.
TARGET: Sedimentary uranium in Tertiary sandstone, plus Olympic Dam type copper-gold mineralisation and Broken Hill or Mount Isa type stratiform base metal mineralisation in the underlying basement rocks. EXPLORATION: Stratigraphic drilling (162...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Paralana Hill. Progress and technical reports to licence expiry/renewal for the period 23/9/1975 to 22/9/1977.
As part of ongoing regional Tertiary stratigraphic appraisal work, an area located to the south and east of the Beverley uranium deposit was explored for economic roll-front style sedimentary uranium mineralisation by conducting resistivity surveys...-
Document
Published: 06 Jul 1977