-
Coombs Springs. First annual report, submitted prior to the start of project joint reporting, for the period 13/11/2006 to 12/11/2007.
A small area centred ~140 km north-northwest of Olary is being explored for possible buried Tertiary palaeochannel or sheet sandstone-hosted, roll-front style sedimentary uranium mineralisation, as well as for possible Mesoproterozoic basement-hosted...-
Document
Published: 04 Jan 1908
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
Paralana Hill. Progress and technical reports to licence expiry/renewal for the period 23/9/1975 to 22/9/1977.
As part of ongoing regional Tertiary stratigraphic appraisal work, an area located to the south and east of the Beverley uranium deposit was explored for economic roll-front style sedimentary uranium mineralisation by conducting resistivity surveys...-
Document
Published: 06 Jul 1977
-
Lake Frome South. Progress reports to licence expiry/full surrender for the period 12/4/1979 to 11/4/1980.
Four samples of fresh attapulgite/palygorskite - bearing dolomitic claystone obtained from backhoe trenches dug into creek beds close to the south-eastern edge of Lake Frome were assessed for their clay material properties, in a search for absorptive...-
Document