Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
Peake-Denison Ranges. Progress and final reports for the period 5/5/1975 to 5/11/1975.
Geochemical sampling was not encouraging for either gold or stratiform copper.-
Document
Published: 01 Jan 1975
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-04 - Woodmurra Project, Denison Inlier, Proterozoic metamorphosed volcanogenic basement stratiform/syngenetic Broken Hill type Pb-Zn-Ag prospects. Final report
An area lying ~70 km east and south-east of Oodnadatta is being explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which may be contained within strongly deformed and metamorphosed Palaeo- to...-
Document
Published: 31 Oct 1916
-
Mount Arthur (part of the Woodmurra Project). Annual report and final report to licence full surrender, for the period 28/11/2014 to 9/3/2017.
An area centred ~70 km east of Oodnadatta has been explored for possible buried economic giant Broken Hill type (BHT) stratiform Pb-Zn-Ag deposits which might be contained within strongly deformed and metamorphosed Palaeo- to Mesoproterozoic...-
Document
Published: 23 Dec 1916
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 1 of 2 ].
[ Note - here is Part 1 of the abstract relating to 2 separately indexed parts ]. As an adjunct to its widespread search for possible diamondiferous kimberlite diatremes on its Abminga Project acreage situated nearby to the north-west, Caldera...-
Document
Published: 09 Feb 1910
-
Peake and Denison Ranges. Progress reports and technical reports to licence expiry/full surrender, for the period 17/2/1969 to 4/5/1971.
An airborne magnetic/radiometric survey was flown over the licence in 1969. Three anomalies located near Peake Homestead Ruins and the Coppertop mine gave disappointing ground survey uranium responses from traverses made with a hand-held...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document