Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake and Denison Project [Part]. Data release upon the surrender of licence. Annual report (15/4/1999) submitted until the commencement of the BHP Billiton - Rio Tinto JV combined reporting. Plus the JV final report on this licence, to 15/4/2003.
Exploration carried out over a south-eastern flanking portion of the Peake and Denison Inliers has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits within a highly magnetic, multiply deformed and metamorphosed buried basement...-
Document
-
Warrina. Annual reports and final report to licence expiry/full surrender, for the period 22/3/2006 to 14/11/2013.
Exploration of an area centred 65 km north-east of Coober Pedy has continued from the licensee's previous work aimed at evaluating the IOCG mineralisation potential of Mesoproterozoic basement-hosted, large and regionally significant coincident...-
Document
-
Anna Creek. Annual reports plus final report to licence expiry/full surrender, for the period 13/8/2007 to 12/8/2014.
A small area centred ~20 km north-west of William Creek has been explored for possible economic buried IOCG mineralisation, which could have formed in Mesoproterozoic basement rocks that in the surrounding region exhibit several large coincident...-
Document
Published: 26 Sep 1914