-
RB 77/00009 Construction materials investigation Redcliff petrochemical site, sections 12, 18, 99, 100, 101, 102, 103, 104, 102, 134 Hd Winninowie, Co. Frome.
Materials suitable for concrete aggregate, railway ballast, road base course, protection of salt field sea wails and rock fill will be required should construction of the petrochemical plant and appurtenant works proceed at Redcliff, 25 km...-
Document
Published: 01 Jan 1977
-
Kybunga (latterly a part of the Balaklava HMS Project - Iluka tenements Group 9). First annual report 3/5/2012 to 2/5/2013, plus a joint annual report and final report for Group 9 submitted at the five project licences' full surrender on 24/9/2015.
Ground within the northern onshore Saint Vincent Basin was taken up by Iluka Resources to re-appraise the heavy mineral sands (HMS) potential of buried Tertiary sediments there, after some unsuccessful exploration had previously been undertaken in the...-
Document
Published: 22 Sep 1915
-
RB 00811 Redcliff Project: geological setting and preliminary assessment of environmental factors.
This report has been compiled at the request of the Redcliff Steering Committee to assist in the preparation of an Environmental Impact Statement. It relies almost entirely on work carried out by Departmental officers and private consultants during...-
Document
-
Lake Torrens Areas 1 and 2, Lake Torrens South and Lake Torrens North (the Lake Torrens Brine Potash Project). First joint annual report plus final report to licences' joint full surrender, for the period 5/1/2015 to 16/6/2016.
Much of the eastern side of the very large, 5,745 square km saline playa Lake Torrens, which occupies one of the most arid parts of Australia, was taken under licence by a Northern Territory - based company with the intent of systematically sampling...-
Document
Published: 14 Jun 1916
-
RB 2014/00006 Geology of the Cultana 1:100 000 map sheet (6432).
The revised digital geology map of the Cultana 1:100 000 map sheet and accompanying geological descriptions in this report are the first components of the 2nd edition PORT AUGUSTA 1:250 000 map sheet to be completed. The subject map sheet occupies the...-
Document
Published: 01 Jan 2014
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
Absorbent Clay Project. Progress reports for the period January 1994 to January 1996.
This project was designed to determine the potential of various clays to absorb harmful or toxic substances present in water intended for human use. The clay samples that were selected for study contain significant amounts of either smectite, kaolin,...-
Document
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document