-
Wiawera. Second partial surrender report, for the period 13/12/1996 to 12/6/2001.
Sheeted vein type gold, Telfer style gold, and BIF hosted gold and base metals were the targets of exploration carried out in Adelaidean sediments of the Anabama - Radium Hill area. Work included an interpretation of aeromagnetic survey data, auger...-
Document
-
Wiawera. Annual reports and final report to licence expiry/full surrender, for the period 13/12/1996 to 12/12/2001.
Exploration for possible sheeted vein type gold, Telfer - style gold, and BIF hosted gold and base metal sulphide deposits that may have formed in Adelaidean metasediments occupying the area between Anabama and Radium Hill, 10-30 km south-east of...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Bonython Hill (part of the Border Project). Annual reports for the period 23/2/2007 to 18/5/2014.
During Year 7 of reporting, exploration work included two 1 km soil geochemical traverses, field inspection of Neogene palaeochannels and land access negotiations with landowners. Previous exploration in the region has recognised the correlation...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Peaked Hill [formerly Trinity mine area]. Progress reports and final report to licence expiry/full surrender, for the period 27/7/1981 to 26/7/1983.
Ongoing exploratory RAB bedrock drilling of 302 shallow holes totalling 1919 m, over an area located approximately 40 km south-east of Olary, has shown that the Pegline Dam prospect is not base metal mineralised, and that the source of an IP anomaly...-
Document