-
Karoonda and Parrakie. Individual licence progress reports to licences' joint expiry/full surrender, for the period 2/9/1986 to 13/6/1991.
TARGET: Possible economic heavy mineral sand accumulations in Pliocene raised beach strandlines developed along the south-western margin of the Murray Basin. EXPLORATION: Aerial photo interpretation, regional sedimentological studies, preliminary...-
Document
Published: 05 Jun 1991
-
Tailem Bend - Bordertown - Mount Gambier area (South-Eastern Coastal Plains Heavy Mineral Sands Project). Progress reports to licence expiry/full surrender, for the period 20/7/1974 to 19/7/1975.
Exploration for possible ancient beach strandline heavy mineral sand placer deposits formed within the Pleistocene Bridgewater Formation has been undertaken in the State's South-East region. This pioneering on-ground work came about after several...-
Document
Published: 01 Jul 1975
-
Calcrete investigations. Progress report nos 1 to 3 for the period September 1974 to December 1976.
Calcrete samples taken from various likely residential and industrial sites in South Australia were examined to determine features applicable to stratigraphic classification and to engineering geology requirements for construction planning.-
Document