Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Stuart Creek. Progress reports and final report to licence expiry/full surrender, for the period 20/8/1979 to 18/10/1982.
One vertical stratigraphic diamond drillhole [the 1a re-drill] was fully cored to 1450 m total depth over a regional gravity high in the western half of the licence which was thought to be prospective for Olympic Dam type polymetallic mineralisation...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence expiry/renewal, for the period 20/7/1973 to 19/7/1975.
Ongoing appraisal work conducted by CSR at the company's newly discovered Cattlegrid copper deposit that lies at the top of the Pandurra Formation has included infill rotary percussion and diamond drilling (13 holes for 554 m, including 166 m cored),...-
Document