-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
Princess Royal, Burra West, Burra North, Florieton, Mount Bryan, Burra Central, Mongolata, Redbanks, Hallett Hill and The Gums (the Burra Project tenement group). Joint annual reports for the period 1/5/2009 to 30/4/2017.
A multi-licence project area centred on the historic abandoned Burra copper mine is being explored for possible economic, buried Burra type copper oxide and copper carbonate mineralisation that may have formed within Neoproterozoic metasedimentary...-
Document
-
Hallett (part of the Nackara Gold Project). Annual reports and final report to licence expiry/full surrender, for the period 9/8/2002 to 4/10/2012.
An area of high country in the far northern Mount Lofty Ranges was taken under licence to try to find the primary source(s) of widely dispersed detrital gold known from Recent and Tertiary cover sediments in the region, while focussing mainly on...-
Document
-
Data release [made at SA Director of Mines' discretion] : Burra Hill (part of the Burra South Project). Annual reports submitted until the commencement of project licences' joint reporting, for the period 1/5/2006 to 30/4/2009.
Within a small licence area centred about 15 km south-south-east of Burra township in the northern Mount Lofty Ranges, Copper Range initially targeted near-surface copper oxide mineralisation associated with an altered and brecciated contact zone...-
Document