-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-42 - Mount Woods Project area, Gawler Craton: assessing the potential for ISGC style mineralisation within the Mount Woods Inlier. Drilling final report
Historically, exploration undertaken for finding Iron Oxide - associated Copper-Gold (IOCG) mineralisation on the eastern Gawler Craton, over the long period since the discovery of the Olympic Dam deposit in July 1975, has targeted positive gravity...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 1919
-
RB 2020/00013 Gawler Craton Airborne Geophysical Survey Region 8B, Billa Kalina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Apr 2020
- ZIP,