Menninnie Dam (part of the Fleurieu - Menninnie Dam Exploration Joint Venture Project). Combined annual report for the 5-year period 24/9/2005 to 26/10/2010, plus annual reports for the period 27/10/2010 to 26/10/2012.
During the 5-year period 2005-2010, intensified exploration undertaken at Menninnie Dam was focussed on the discovery and delineation of structurally controlled hydrothermal Pb-Zn-Ag mineralisation. Carbonate-rich Hutchison Group metasediments forming...-
Document
-
Warrow. Progress and final relinquishment reports for the period 10/6/83 to 9/12/84.
Extensive geophysical prospecting, an 8 hole percussion drill coring programme (477 m) and a 140 hole RAB drilling programme (1798 m) at the Lady Franklin prospect were not encouraging. Percussion drillhole 83WP2 intersected a zone of primary but...-
Document
Published: 19 Dec 1984
-
Marble Range. Annual reports plus first partial relinquishment report, for the period 30/4/1997 to 16/3/1999.
Aircore drilling of gold and base metal targets (23 holes, total 1136 m) was undertaken following lag, rock chip and leach sampling and a review of previous aeromagnetic and drillhole data from three separate areas, 40 km west and 50 km north-west and...-
Document