Data release [made at SA Director of Mines’ discretion] : Uley graphite deposit. Proposed open cut mine and ore processing plant. Mining study reports submitted during 1988.
Formal mining proposal documents submitted to PIRSA for approval as part of the process of re-opening the Uley graphite mine to sustain a planned 10 years duration open pit mining operation.-
Document
Published: 01 Jan 1988
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-11, Thurlga Ramp, northern edge of Cleve Domain, volcanic epithermal / hydrothermal replacement type precious metal prospects. Drilling final report.
A licence area, which lies adjacent on the west to Investigator Resources' Peterlumbo Hill EL 5368 containing the Paris silver deposit (where there is a currently inferred resource of 42 Moz @ 139 ppm Ag), is being explored under a joint venture with...-
Document
-
Sleaford Mere. First annual report, plus final report to licence expiry/full surrender, for the period 19/6/2014 to 18/6/2016.
Exploration of an area extending for ~9 km along the western, shore-land side of the Sleaford Mere lagoon, located near the southern tip of Eyre Peninsula, has mainly sought to identify possible untested buried graphite occurrences which could be...-
Document
-
Data release [made at SA Director of Mines' discretion] : Malbrom. First annual report submitted until the commencement of joint venture project joint reporting, for the period 5/4/2013 to 4/4/2014.
A licence composed of four separate small sub-blocks which generally lie ~90 to 120 km north-northeast of Port Lincoln is being explored primarily for extensions to known graphite-bearing horizons which may exist to the north and south of the...-
Document
Published: 29 May 2014