-
RB 79/00087 Geochemical sampling of the Sturtian tillite and basal Tapley Hill Formation, Copley.
In a sampling programme carried out over the Sturtian Merinjina Tillite and basal Tapley Hill Formation strata on parts of the COPLEY 1:250 000 mapsheet area, 684 soil samples and 71 rock samples were collected at 25 m and 12.5 m intervals along 24...-
Document
Published: 01 Jan 1981
-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document