-
Artipena. First progress/final report to licence expiry/renewal, for the period 21/5/1970 to 20/5/1971.
Reconnaisance and detailed geochemical surveys, plus limited diamond drilling at the Baratta mine (2 holes for 480 feet), failed to find any extensions to known but worked-out near surface Cu-Pb-Zn lodes. It was concluded that only a small area...-
Document
-
Baratta Hill. Combined first annual / final report at licence surrender for the period 16/4/2009 to 20/9/2009.
Exploration for possible diapir-related, discordant and stratabound sediment-hosted base and precious metals in an area located 32 km east-northeast of Cradock targeted an anomalous structural feature within Adelaidean metasediments, namely, a...-
Document