-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Echunga (part of the Mount Barker Project). Annual reports, first partial surrender report and final report to licence full surrender, for the period 7/7/2016 to 5/6/2019.
An area surrounding the historic Echunga goldfield locality, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Eurelia. Progress and annual reports to licence expiry/renewal for the period 23/6/1969 to 22/6/1970.
In an area located approximately 7 to 20 miles north of Orroroo, a number of previously worked old small barite and copper prospects were examined in detail, and recommendations were made for additional work to be done, e.g. bulldozer trenching, soil...-
Document
Published: 10 Jul 1970