-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Yerila Creek. Progress and final reports for the period 8/9/1980 to 7/11/1983.
Exploration for possible epithermal uranium and base metal deposits as part of Marathon's Gunsight Project, in the northern part of the Mount Babbage Inlier around Prospect Hill, comprised orientation and regional rock chip, stream sediment and soil...-
Document