-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-02, Titan mineral prospect. Project interim and final reports.
Titan prospect is located within Exploration Licence 3209, and lies 30 km north of the Olympic Dam mine. The prospect was first drilled by Western Mining Corp. in 1976 with diamond drillhole BD 1, and in 1981 with a second hole, BD 2. Both holes hit...-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Mount Gunson (part of the Mount Gunson Project). Reports for the period 15/7/1994 to 24/3/2016.
There is no abstract created for this record-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 14/7/1998 [ Index Part 1 of 4 ].
An area of open ground encompassing the historic Mount Gunson mining district on the Stuart Shelf and three existing mining leases was taken up by David Clarke to explore for possible economic copper-cobalt mineralisation and any other precious or...-
Document