Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports and final report to licence expiry/renewal over a reduced area, for the period 4/8/1995 to 3/8/2000.
Stuart Metals took up EL 2099 covering ground in the Wirrappa - Lake Blyth - Bookaloo Siding area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Mount Gunson, Woocalla, Bernard Hill, Mount Moseley and Emmie Bluff (the Mount Gunson Project). Respective second to fourth partial surrender reports, for the overall period 15/7/1994 to 12/10/2004.
No work has been undertaken on the currently relinquished portions of ELs 3112, 2639, 3008 and 3022. However, as an attachment to the current EL 3112 relinquishment report, all technical data for Stuart Metals' recent diamond drillhole MGD24 (to...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document
-
Pernatty Lagoon. Final report, Project ADI RD02-295 [Accelerated Discovery Initiative Round 2, 2022].
This report pertains to the Pernatty C Zambian Copperbelt (ZCB) Project which was partially funded by a $298,500 grant through the State Government’s Accelerated Discovery Initiative (ADI) which aims to make a major contribution to achieving the South...-
Document
Published: 02 Aug 1922
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 18/10/2008 to 24/3/2018.
During licence Year 15 (2008-2009), activities at Mount Gunson comprised: - pegging of three Mineral Claims at the MG 14 deposit in December 2008; - acquiring part of a larger project-wide ground gravity survey during April-May 2009 (510 stations...-
Document
Published: 22 Aug 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Winjabbie. First partial surrender report at licence expiry/renewal, for the period 20/10/2005 to 19/10/2010.
The western half of EL 3432, which now lies within the continuously restricted access Red Zone of the Woomera Prohibited Area, has been relinquished at expiry of term, acting upon advice received from DMITRE. During its 5-year tenure period the...-
Document
Published: 03 Dec 1912
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-07 - Intercept Hill JV Project, central Stuart Shelf area - Oak Dam South Proterozoic basement IOCG mineral prospects. Drilling project final report.
The Intercept Hill Project area is located in the central part of the Stuart Shelf. Gawler Craton basement rocks in the project area comprise leucocratic granite of the Hiltaba Suite, volcanic rocks of the Gawler Range Volcanics and metasediments of...-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Pernatty Lagoon [East]. Annual reports to licence expiry/renewal, for the period 27/6/1997 to 26/6/2002.
An area of the Stuart Shelf located between Pernatty Lagoon and the Beda Arm of Lake Torrens, with its western boundary lying 15 km east of the historic Mount Gunson copper mining field, is being explored for possible economic basement-hosted IOCG...-
Document
-
[Key SAMREF record for accessing referenced reports and data via DEM Content Manager - SPOT] Mount Gunson (part of the Mount Gunson Project). Reports for the period 15/7/1994 to 24/3/2016.
There is no abstract created for this record-
Document