-
Macclesfield (part of the Mount Barker Project). Annual reports and final report to licence expiry/full surrender, for the period 6/4/2016 to 5/6/2019.
An area surrounding the township of Macclesfield, and lying a short distance south-east of Terramin Limited's Bird-in-Hand historic gold mine redevelopment project, has been explored for inferred sediment-hosted primary gold mineralisation that may...-
Document
Published: 13 Jun 1919
-
Meadows (part of the Mount Barker Project). First annual report plus final report to licence expiry/full surrender, for the period 20/4/2017 to 19/4/2019.
A small area covering part of the Meadows Fault scarp and part of the adjoining Tertiary-Recent Meadows Basin has been explored for inferred sediment-hosted primary gold mineralisation that may have formed in favourable Neoproterozoic bedrock...-
Document
Published: 13 Jun 1919
-
Interpreted basement geology to the Murray Basin and surrounds.
The purpose of this interpretation is to provide an initial framework for the basement to the Murray Basin upon which to plan the Geological Survey of South Australia’s MinEx CRC National Drilling Initiative drilling project targeting the Delamerian...-
Map
Published: 07 Jul 2020
- PDF,
- ZIP