RB 84/00089 Gladstone quartzite rail ballast deposit. Fourth report. Sections 39W, 39E, Hundred Booyoolie.
412 000 m3 of rail ballast was produced between 1968 and 1975. 2 stages of future quarry development are proposed : advancement of the existing southern quarry face about 70 metres to yield 100 000 m3 of in situ material beneath 50 000 m3 of...-
Document
Published: 01 Dec 1984
-
RB 98/00015 Clare Valley groundwater resources. Progress report 1 - Hydrogeology, drilling and groundwater monitoring.
A fundamental question remains to be answered in the Clare Valley. How much water can be safely extracted without causing depletion of the groundwater resources? This question is being addressed by a major investigation into the groundwater...-
Document
Published: 01 Oct 1998
-
RB 91/00078 Brick shale resources in the Roseworthy Sheoak Log Freeling area. Results of auger drilling, 1988.
Clay resources in the Roseworthy - Sheaoak Log - Freeling area, 50km northeast of Adelaide, were investigated as a potential source of raw material for brick manufacture. Twenty three auger holes totalling 242 metres outlined areas of weathered...-
Document
Published: 01 Jan 1991
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurelia Diamond Project. Joint annual reports for the period 1/1/2014 to 17/11/2018.
Since taking over ownership of five licences that previously formed parts of Flinders Mines' Springfield Project, by a purchase agreement that took force in June 2014, Diamond Resources has been working to define, identify and prioritise advanced...-
Document
Published: 31 Dec 1918
-
Clare. Progress reports to licence expiry for the period 14/2/86 to 13/8/87.
TARGET: Copper and gold in structurally controlled replacement zones within Torrensian Burra Group sediments. EXPLORATION: Rock chip sampling in an area of previously reported anomalous gold in fine-grained sediments, and the conduct of complex...-
Document
Published: 10 Oct 1987
-
The Flinders Ranges Project, Jamestown Group of tenements. Data release at partial surrender of subsequent licences: base metal exploration farminee's combined annual reports for the period 1/1/2007 to 9/11/2010.
Copper Range is exploring a number of the Jamestown Project mineral tenements for base and precious metals under the terms of a joint venture agreement that it made with licensee Flinders Diamonds on 19/3/2007, whereby the latter retains all rights to...-
Document
Published: 03 Mar 1911
-
Kapunda. Progress reports, annual reports and technical consultants' reports submitted until licence expiry/full surrender, for the period 30/11/1981 to 29/5/1985.
Economic evaluation of the Kapunda copper deposit for open pit mineability has included the acquisition of experimental and ore - definitive EIP and MIP surveys along strike extensions of the main fault zone, the commissioning of consultants' detailed...-
Document
Published: 29 Jul 1985