-
Bute. Progress reports and final report to licence full surrender, for the period 16/1/1980 to 30/6/1982.
In the latter stages of its search for possible economic base and precious metal deposits in the Bute area, North Broken Hill targeted the concealed pre-Adelaidean basement rocks for Mount Gunson or ?Olympic Dam type hydrothermal ores, and for Mount...-
Document
-
Port Pirie district (part of the G2 [Lineament] Project). Annual reports plus final report to licence expiry/full surrender, for the period 29/3/1996 to 28/3/2000.
An airborne magnetic/radiometric survey to infill recent SAEI regional survey coverage was carried out within the G2 structural corridor, south-east of Port Pirie. Six bullseye magnetic highs, consistent with kimberlite emplacement, and one having...-
Document
Published: 20 Mar 1997
-
Crystal Brook area (part of G2 [Lineament] Project). Annual and final reports for the period 29/3/1996 to 28/3/2000.
An aeromagnetic / radiometric survey was carried out within the G2 structural corridor, south-east of Port Pirie, as part of a search for possible Moonta, Olympic Dam or Ernest Henry type gold - copper mineralisation, and for any diamond-bearing...-
Document
-
Geology of the Roopena and Uno 1:100 000 sheet areas, eastern Gawler Craton.
This report describes the results of a MESA consultant's second generation regional geological mapping and drillhole data interpretation work for the Roopena and Uno 1:100 000 sheets on PORT AUGUSTA, performed during 1993 and 1994 as part of the SAEI...-
Document
-
Cultana basement regional geology 3D Model.
The Cultana basement 3D Geological Model covers a region which includes the Roopena, and western half of the Cultana, 1:100,000 mapsheet areas. The subsurface geology that has been modelled comprises a succession of deformed Palaeoproterozoic...-
Model
- PDF,
- ZIP
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 2017