-
Peachna. Progress reports, annual reports and final report to licence full surrender, for the period 22/9/1988 to 8/9/1994.
Possible economic Broken Hill - type stratiform Pb and Zn, and Middleback Range style iron ore, were targeted near Lock on central Eyre Peninsula by Western Mining Corp., who farmed-in to Stockdale's EL 1516 on March 1st, 1990 as part of a regional...-
Document
-
Lake Gilles (part of the Wilcherry Hill Project). First and second partial relinquishment reports, for the period 10/10/2002 to 9/10/2004.
Exploration for economic near-surface deposits of gold and base metals, in an area of possibly hydrothermally-altered Hiltaba Suite Mesoproterozoic basement located approximately 20 km north of Kimba, has comprised an assessment of previous...-
Document
Published: 15 Nov 1904
-
Yardea (part of the Gawler Project). Final report at licence full surrender, for the period 22/6/2012 to 31/1/2013.
An area centred about 27 km north-west of Kimba was selected mainly to explore the basement for Menninnie Dam style base metal mineralisation, with the block's NW portion also being considered prospective for epithermal precious metal deposits of...-
Document
Published: 31 Jan 1913