-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Mount Gunson and Mount Moseley (part of the Mount Gunson JV Project). Partial surrender reports, for the overall tenure period 15/7/1994 to 25/5/2021.
No exploration work has been undertaken on either of the recently relinquished portions of the two subject licences. Within the JV project tenements, exploration targets being addressed are: (1) possible economic buried IOCG (iron oxide-associated...-
Document
Published: 17 Oct 1918
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release - as updated : Lucas Hill. Annual reports to licence expiry/full surrender, for the period 1/8/2011 to 30/7/2019.
An area centred ~25 km south-east of Woomera township is being explored for possible buried economic IOCG style mineralisation that may be related to a poorly defined gravity anomaly and associated magnetic anomaly in the vicinity of Lucas Hill. A...-
Document
Published: 05 Aug 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 1 of 2].
An area on the Stuart Shelf which is centred ~45 km north-northwest of Mount Gunson and 70 km south-east of Olympic Dam was taken up to explore primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits, perhaps of...-
Document
Published: 15 Nov 1913
-
Intercept Hill. Annual reports to licence expiry/full surrender, for the period 8/5/2003 to 14/7/2013. [Index Part 2 of 2].
In March 2010, once the terms of the joint venture agreement had been finalised, Argo passed its complete data sets to Xstrata, who immediately commenced a re-logging of Argo's drill cores besides conducting comprehensive unconstrained 3-D modelling...-
Document
Published: 15 Nov 1913
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 14/7/1998 [ Index Part 1 of 4 ].
An area of open ground encompassing the historic Mount Gunson mining district on the Stuart Shelf and three existing mining leases was taken up by David Clarke to explore for possible economic copper-cobalt mineralisation and any other precious or...-
Document