-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Mount Whyalla. Annual reports plus final report to licence full surrender, for the period 30/4/2014 to 7/9/2017.
The only work performed for exploration of an area centred ~35 km west of Port Augusta was a desktop geophysical data review aimed at identifying any base metal or gold targets which could represent buried mineralisation that had formed within IOCG or...-
Document
Published: 16 Dec 1917
-
[Final] Summary report, SML 204, SA.
BHP took out SML 204, covering 970 square miles located due east of the northern Middleback Range, for 2 years from 1/7/1968. The prime objective was to explore there for uranium and copper mineralisation. Work undertaken can be summarised as...-
Document
-
Red Lake (part of the Olympic Domain Project). Combined first annual / final report to licence expiry/full surrender for the period 18/6/2009 to 17/6/2010.
EL 3809 is part of Copper Range's Olympic Domain Project which comprises a group of thirteen tenements located in central South Australia covering areas of the Gawler Craton and Stuart Shelf within and west of Lake Torrens. Across this project acreage...-
Document
Published: 17 Sep 1910