Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 2 of 2] progress reports for the period 19/7/1984 to 6/12/1990. Part 1 of 2 also included.
Exploration of the Tarcoola Gold Field by Aberfoyle Resources began in mid-1984, following a partial relinquishment of other ground at licence renewal, when some promising gold assay values were detected from rock and mine dump sampling. Geological...-
Document