Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 2 of 4 ].
[ Note - here is only Part 1 of an abstract comprised of three separately indexed parts ]. Exploration of the Tarcoola Goldfield and nearby areas recommenced under a new licence tenure group in June 1991, with joint venture operator Queens Road...-
Document
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 1923
-
Data release [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports to licence expiry/renewal, for the period 2/6/2003 to 1/6/2008.
Exploration Licence 3089 is located in the central Gawler Craton and is centred near the township of Tarcoola. Continuation of tenure over the same area, from former ELs 1827 and 2510, was renewed by Gravity Capital Ltd on 2/6/2003, and full licence...-
Document
-
Hicks Hill. Annual reports plus final report to licence expiry/full surrender, for the period 9/12/2009 to 8/12/2014.
A previously discovered (SADM, 1950s) partly outcropping body of magnetite-rich Palaeoproterozoic BIF rock (jaspilite), located ~46 km east of Tarcoola, has been investigated afresh for its current economic potential as an iron ore resource. Similar...-
Document
Published: 20 Apr 1915
-
Malbooma (part of the Tarcoola Joint Venture Project). Progress reports to licence expiry/full surrender, for the period 20/1/1983 to 1/3/1985.
Following the partial relinquishment of 481 square km of EL 859 on 30/3/1983, exploration continued for stratiform Pb-Zn within the Carpentarian Tarcoola Beds within an east-west trending trough, or half-graben, seen on magnetics in the Wilgena Hill...-
Document
Published: 18 Oct 1984
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-41, Coolybring magnetite prospect. Project final report.
EL 3089 licensee Stellar Resources Ltd was granted SA Government PACE Initiative Year 2 funding for a drillhole programme to test the source of the intense Coolybring magnetic anomaly situated 9 km north-east of Tarcoola, which is inferred to be a...-
Document
Published: 11 Nov 1905