-
Jupiter and Kalkaroo Projects. Final report for geophysical definition studies of the Jupiter prospect magnetotelluric anomaly and the Kalkaroo Dome fault structure, Project ADI RD01-117 [part of Accelerated Discovery Initiative Round 1, 2021].
A new broadband (104 to 0.01 Hz) MT survey array, comprised of four profiles having 1 km site spacing and 5 km line spacing, was used in May-June 2021 for collecting data at 63 sites to build upon two previous models of the electrical resistivity...-
Document
-
Proterozoic copper-gold systems of the Curnamona Province - members of a global family?.
Copper-gold systems of the Curnamona Province show many of the characteristics of major Cu-Au Fe-oxide systems in other Proterozoic terranes. Large and economic Cu-Au deposits, however, have remained elusive in the province, despite discoveries in...-
Document
-
Toweroo Bore. Progress reports to licence surrender for the period 30/9/1968 to 30/4/1970.
Uranium exploration, undertaken over a small area of poorly outcropping to shallowly subcropping amphibolite facies metamorphosed Early Precambrian basement located near Toweroo Bore, 35 km north-northwest of Crocker Well, has comprised 144 line km of...-
Document
Published: 04 Feb 1970