-
RB 60/00030 Report on reconnaissance seismic refraction survey in the South Australian portion of the Eucla Basin, 1964.
A reconnaissance seismic refraction survey was carried out in the South Australian portion of the Eucla Basin, to determine the general shape of the basin and to assess the feasibility of using seismic methods in the area. Some of the refractors...-
Document
Published: 18 Feb 1965
-
RB 79/00083 Ooldea no. 1 and Reid nos 1 and 1A. Well completion reports.
Three stratigraphic wells (Ooldea no. 1, Reid no. 1, and Reid no. 1A) were drilled by the South Australian Department of Mines during 1976 in an area that includes margins of the Officer, Arckaringa and Eucla basins. Principal objectives were to test...-
Document
Published: 01 Jan 1979
-
RB 90/00029 Seismic study of the offshore Denman and Eucla Basins.
Four horizons were mapped (top of basement, top of Permian, top of Cretaceous and Sea Floor). The Denman Basin is a 50 km wide, north-south trending depression in Early Palaeozoic - Precambrian bedrock, infilled with up to 400 metres of Permian...-
Document
Published: 01 Apr 1991
-
RB 90/00030 Duntroon geophysical study.
The Duntroon Basin is located in the centre of the Southern Rift System between the Bight and the Otway Basins, west and SW of Kangaroo Island. It is limited to the north by the Proterozoic Gawler Craton. The formation of the basin is related to the...-
Document
Published: 01 Dec 1990
-
Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
PEL 4, Eucla, Denman and Bight Basins. Progress and technical reports for the period 13/9/68 to 18/4/74.
PEL 4 was granted to Outback Oil Co. NL on 14/11/68 to succeed the onshore part of the former OEL 33 in the Eucla Basin region, and allow continuity of exploration in a little known petroleum province. Early in licence Year One Outback Oil succeeded...-
Document
Published: 08 Apr 1974
-
PEL 33, Eucla and Denman Basins. Progress reports for the period 25/6/85 to 18/4/89.
Contains interpretation reports on satellite imagery remote sensing and reprocessed aeromagnetic data, plus other brief interpretative statements by the contract operator contained within some quarterly tenement reports.-
Document
Published: 18 Apr 1989
-
1987 seismic surveys, Denman and Denman 'B', final reports.
Denman Seismic Survey - AIM: This seismic survey of 4 lines totalling 40.0 line kms coverage was conducted in the southern Denman Trough, in the vicinity of Outback Oil's Denman 1 well drilled in 1966, in order to fulfil the Licence Year 2 work...-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document
-
Borda Prospect file, EPP 25, Duntroon Basin, offshore South Australia.
BHPP's Borda 1 well is herein proposed to test a faulted four-way dip closure in permit EPP 25 with an estimated fault dependent closure area of 26.2 square kilometres and height of 125 metres. The trap formed during the Late Eocene to Early...-
Document
-
Sensitivity analysis, [seismic] line DH91-131 2-D modelling, Duntroon Basin.
There is no abstract created for this record-
Document
Published: 12 Aug 1996
-
RB 00780 Brief study of the Eucla Basin, with recommendations for further petroleum work.
This report provides a brief summary of the geology and petroleum potential of the onshore, South Australian portion of the Eucla Basin at the time of termination of PEL 4, with the aim of providing a starting point for more thorough studies.-
Document
Published: 31 Jan 1900