-
Curnamona [Sedimentary Uranium Exploration] Project. Joint annual report for the calendar year 2012.
During 2012, Afmeco conducted a fourth exploratory drilling campaign spread over six of its eight Curnamona Project tenements, which was designed to test the extensions of the Erudina, Yarramba and Coolibah Palaeochannels, as well as probing in basin...-
Document
-
Mount Distance. Progress and final reports to licence expiry for the period 3/9/1970 to 2/9/1971.
In a search for possible roll-front type secondary uranium deposits emplaced in piedmont alluvial sediments over an area adjacent to the north-western edge of the Mount Painter Block, the licensees drilled 6 scout vertical rotary holes totalling 2151...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Lake Callabonna / Petermorra (part of the Lake Elder Project). Annual reports for the period 19/3/1998 to 30/4/2015.
Exploration Licence 2494 was granted in March 1998 to Paladin Energy Minerals NL and Brightstar Power Corporation Pty Ltd - the Paladin Brightstar Joint Venture (PBJV), with Paladin Resources NL as manager. The target commodity being explored for by...-
Document
Published: 20 May 2015