-
Wirrealpa. Progress, partial surrender and final reports to licence surrender for the period 13/11/1978 to 26/2/1988.
Economic deposits of Mississippi Valley type stratabound lead-zinc mineralisation within in Cambrian limestones were the targets of exploration undertaken on and near the Wirrealpa Diapir. A preliminary field reconnaissance had shown that surface...-
Document
-
Beltana - Aroona region. Progress reports and technical reports to licence expiry/renewal, for the period 16/7/1971 to 15/7/1972.
Continuing prospect exploration work at the Beltana zinc orebody discovery has consisted of detailed geological mapping at 1:4 800 scale, rock chip sampling of outcropping Adelaidean and Cambrian sediments, field investigation of microgravity...-
Document
-
Mount Uro. Progress, partial surrender [and ?final] reports to licence surrender for the period 29/4/1984 to 26/2/1987.
Adelaidean and Cambrian calcareous clastic rocks of the Angepena region were investigated for possible economic epigenetic base and precious metal mineralisation that may be related to syn-depositional faulting, as well as for stratiform and...-
Document
-
Teatree Well. Progress and final reports to licence expiry/full surrender for the period 5/1/1984 to 4/1/1986.
Exploration for possible fault-related epigenetic lead-zinc deposits formed in calcareous rocks outcropping along the Mount John - Arrowie fault system, to the south-east of the Moro mine, has included extensive stream sediment and rock chip sampling...-
Document
-
Woolly Dam. Progress reports and final report to licence expiry/full surrender, for the period 9/1/1978 to 8/1/1980.
Exploration undertaken in an area of practically no outcrop that is situated north and north-west of the Ediacara Range, on the eastern side of Lake Torrens, has aimed primarily at investigating the mineral potential of a large, low amplitude...-
Document
Published: 05 Jun 1980