-
Pernatty Quarry. Reports on site investigations for the period September 1986 - March 1989, re. Pernatty Crushing Contract no. 1 [let to McMahon Construction Pty Ltd].
Geoscientific information on quarry materials, copied from former Highways Department files. The subject quarry site was chosen in order to provide crushed rock products for the reconstruction of the Pimba - Wirrappa section of the Stuart Highway....-
Document
Published: 17 Mar 1989
-
Mount Gunson. Reports on trial seismic refraction surveys conducted in 1966 and 1972 to map possible ore-bearing horizons.
Reports describe the results of two attempts to use seismic refraction methods to map an unconformable subsurface interface between lithic sandstone and quartzite units within the Whyalla Sandstone. This palaeosurface is important as a locus for...-
Document
-
Price. Progress and final reports to licence surrender, for the period 27/4/1977 to 6/12/1978.
Continuation by Aquitaine of its regional appraisal of the mineral potential in the Cambrian carbonate sequence on northern Yorke Peninsula, has recently involved them in acquiring and interpreting ground gravity and magnetic surveys, completing a...-
Document
-
Pernatty Lagoon. Progress reports and final report to licence full surrender, for the period 5/9/1974 to 7/7/1975.
Base metal exploration in an area lying immediately to the east of Pernatty Lagoon targeted stratiform deposits within Late Proterozoic metasediments, seeking shallowly-occurring favourable stratigraphic facies associations based on the Zambian...-
Document