-
Data release - as updated [made at SA Director of Mines' discretion] : Beltana / Copley. Annual reports to licence expiry/renewal, for the period 25/6/2003 to 23/11/2013.
During licence Year 11, on renewed EL 3111 (to 27/7/2004), Perilya's exploration was focussed on expanding the mineralised intersections found near Reliance in the previous year, and on investigating the open-at-depth mineralised palaeo-karstic...-
Document
Published: 08 Jan 1914
-
Data release [made at SA Director of Mines' discretion] : Ediacara (part of the Flinders Ranges Project). Annual reports to the commencement of project licences' joint reporting, for the period 3/12/1999 to 2/12/2001.
A preliminary evaluation of the zinc potential of the historic Ediacara lead-silver prospect and surrounds has consisted of a review of previous surface and subsurface geochemical data, and the conduct of orientation rock chip, calcrete and soil...-
Document