-
RB 93/00042 Orroroo bedrock drilling 1993.
Eighty three reverse circulation drill holes totalling 2615.5 metres were drilled on Quorn, Orroroo, Paratoo and Carrieton 1:100 000 sheets to determine bedrock geology and geochemistry below sedimentary cover. The program is a part of the South...-
Document
Published: 01 Oct 1993
-
RB 2009/00001 Explanatory Notes for [the] CALLABONNA 1:250 000 Geological Map, sheet SH 54-6.
The CALLABONNA map area includes the southern end of the Strzelecki Desert and the north- eastern Flinders Ranges, between latitudes 29° to 30° S and longitudes 139° 30' to 141° E. Cameron Corner adjoins New South Wales and Queensland in the...-
Document
Published: 01 Oct 2009
-
Anabama [Copper-Molybdenum Project]. Progress and final reports to licence expiry/renewal, for the period 26/10/1972 to 25/10/1974.
Ongoing exploration by the SA Department of Mines of the copper and molybdenum - mineralised Anabama Granite batholith, which is located 20 km south-east of Manna Hill, has involved detailed geological mapping, soil and rock chip sampling, and the...-
Document
-
Olary (latterly part of the Olary Project). Annual reports and final report to licence full surrender, for the period 21/1/2008 to 20/01/2015.
A large area located immediately south and south-west of Olary has been explored initially for possible economic buried primary epithermal to mesothermal copper-gold and gold only mineralisation that might have formed in Adelaidean and older bedrock,...-
Document
Published: 01 Apr 2015