-
Lignum Dam. Progress reports plus final report to licence full surrender, for the period 7/1/1974 to 27/5/1975.
As follow-up to a programme of uranium exploration lately carried out in its adjoining EL 63, Tricentrol chose to drill an additional area of prospective Tertiary Murray Basin sediments present in the vicinity of the Anabama Fault zone, to further its...-
Document
Published: 07 May 1975
-
Mount Lyndhurst. Progress and final reports for the period 4/1/1973 to 3/1/1975.
Exploration for stratabound copper mineralisation in the Mount Lyndhurst area, allied with intensive prospecting of existing Mineral Claims and other historic base metal prospects and reported showings, has demonstrated a favourable geological...-
Document
Published: 02 Jan 1975
-
Radium Hill - Mutooroo area. Annual and technical reports for the period 1/3/1969 to 28/2/1971.
There is no abstract created for this record-
Document
-
Mount Fitton. Progress and final reports to licence amalgamation/renewal for the period 19/5/1969 to 31/1/1971.
After reviewing the existing Anaconda regional stream sediment geochemical anomalies, North Flinders Mines attempted to replicate the reported high zinc values in the north-east of the licence area, by conducting a higher density reconnaissance stream...-
Document