Shallow groundwater quality monitoring program for the Onkaparinga Catchment Water Management Board area.
The Onkaparinga Catchment Water Management Board (OCWMB) is responsible for an area of approx. 920 square km which includes the Onkaparinga Catchment in the Adelaide Hills and the Noarlunga and Willunga sedimentary embayments south of Adelaide, South...-
Document
-
Hallett Brick Landfill Pty Ltd, proposed sanitary land fill site at Smart Road, St Agnes, South Australia. Environmental Impact Statement.
The proposal for development of sand and clay pit for solid waste disposal is environmentally sound. The study included geotechnical investigation and concluded that management of a Council commercial and industrial waste disposal facility would be...-
Document
-
RB 56/00015 Objection to registration of mineral claim, pt secn 809N Hd Pirie.
There is no abstract created for this record-
Document
Published: 18 Jan 1963
-
RB 78/00073 Land use conflicts. Plumbago pastoral lease and historic reserve.
Discusses impact of mineral exploration on Aboriginal historic sites with pictorial record of principal areas of concern.-
Document
Published: 01 Jan 1978
-
RB 78/00025 Submission to the Hart inquiry into the control of private development in South Australia.
Examines the way in which the South Australian Planning and Development Act allocates present and future land use with respect to the mining and quarrying industry, highlighting its inadequacies, and makes numerous recommendations for improvements in...-
Document
Published: 08 Mar 1978
-
RB 78/00084 Land use planning and the mineral industry practices and problems. The Australian scene.
Control of mineral workings and mineral resource protection is largely neglected. The future availability of essential mineral and energy products requires protection and control.-
Document
Published: 01 Aug 1978
-
RB 78/00083 Extractive industry towards a planning philosophy.
Describes special features of mineral bearing land to provide basis for developing practical planning policies.-
Document
Published: 01 Jan 1978
-
Archaeological survey of the Wallaroo copper smelters, Wallaroo, South Australia.
There is no abstract created for this record-
Document
-
Investigation into public risks from potential landfill gas migration and abandoned underground clay mine workings in the Saint Agnes district of Adelaide.
Field investigations including drilling and soil gas sampling, carried out as part of a subsurface hazard assessment for a parcel of land at Saint Agnes, did not indicate any significant risks to an intended building development.-
Document
Published: 27 Feb 1903
-
Mines in Burnside - their historical significance.
This report on the history and condition of the abandoned pioneer silver-lead mines at Glen Osmond on Adelaide's eastern outskirts was prepared for the Burnside suburban council to allow it to make an informed discussion about the possibility of...-
Document
-
Proposed residential development at the disused Brompton Gasworks site. Landfill environmental assessment and rehabilitation reports for the period August 1986 to December 1990.
The disturbed soil profiles at 29 historic light to heavy industrial sites in the city of Hindmarsh were investigated to determine their respective levels of hazard contamination and suitability after rehabilitation for undergoing residential...-
Document
Published: 18 Dec 1990
-
Summary of a strategic review of sand, clay and shale resources for metropolitan Adelaide.
This review has been undertaken to meet the State Government's commitment to maintain a long-term, competitively priced supply of extractive minerals to the community, as mandated by Strategy 1.5H of the S.A. Government response to the Resources Task...-
Document
Published: 18 May 1902
-
Review of unallotted Crown lands on Eyre Peninsula. 31st August 1984.
Of 691 000 ha. of Crown Land, 18 000 ha. could be profitably developed by adjoining landowners. High environmental significance has been established for land with agricultural potential in the Hundreds of Peella and Corrobinnie and detailed...-
Document
Published: 01 Jan 1984
-
Evaluation of long-term development options for metropolitan Adelaide. An examination of the opportunities for and constraints to future urban development. A discussion paper.
Examines issues and opportunities for urban growth beyond 1997 when it will probably be necessary to promote new development outside the existing urban boundary. Concludes that urban consolidation would be the most cost effective way to cater for...-
Document
-
Proposed Victoria to South Australia 275 kV transmission line. Landscape assessment.
Proposal will allow extension of the Victoria / New South Wales interconnected transmission system to SA and involves construction of transmission line from a terminal station near Heywood (Vic) to a location near Penola. The visual impact of several...-
Document
-
Jane Eliza Landing Marina estate development. Draft environmental impact statement.
Base data identifying the major environmental, social and economic issues pertaining to the establishment of houseboat marina, residential estate and tourist / commercial facility area adjacent to the River Murray and Ral Ral Creek at Renmark. It...-
Document
-
Tungkillo to Tailem Bend. Proposed 275 kV transmission line. Draft environmental impact statement.
Transmission line will provide for an increasing demand for power in the South-East and interconnect with the Victorian and NSW electrical systems in a power sharing arrangement. Considers environmental impact along 3 alternative corridors.-
Document
Published: 01 Jan 1986
-
Assessment of the Environmental Impact Statement prepared for Cape Investments Pty Ltd on the residential land division at Thompson Beach pursuant to section 49, the Planning Act, 1982.
Concludes that the project conflicts with planning and coastal management policies and that it would result in significant impact to the biological system of the area.-
Document
-
Seaford structure planning report.
Structure plan, staging development plan and guidelines for urban expansion. Considers Maslin Beach industrial sand mining.-
Document
-
Nunnyah Conservation Reserve management plan. Draft report.
Reviews cultural and natural history and environmental impact. Majority of land is in an undisturbed natural condition and could be rehabilitated to `wilderness condition in 20-30 years.-